We Offer Best Solution to Increase Efficiency and
Productivity in Your Factory

Modification & Improvement (KAIZEN) Factory Facility

SAFETY – QUALITY – CAPACITY UP – WORK ENVIRONMENT

SAFETY
Creating a pleasant and comfortable work environment for workers is the basic concepts of safety, we have the competence to provide you a design and construction for safety to make workers feel safe when they at work.
Example : Life line, maintenance deck, etc
BEFORE
Temporary Lifeline (Rope)
AFTER
Permanent Lifeline (Pipe)
BEFORE
No Deck For Maintenance Duct
AFTER
Deck Installed for Maintenance Duct
QUALITY
Develop trusting relationships with Customer by delivering a good quality products that achieve agreed requirements and give Customer Satisfaction, we provide device or environment to take care quality of product.
Example : Plastic room, green net, etc.

Plastic Room

Clean Room from Production

Green Net

Remove for floating tiny dust

CAPACITY UP
Maximized Space

Economic growth is often defined as a production increase of an output of a production process, this condition insist to capacity up, We help Customer to maximized space and facility at factory with considering safety and quality
Example : Gantry hoist, machine relocation, etc.

Gantry Hoist Structure

Structure for Material Transfering of Tools

Auto Rack System

Maximizing Storage Integrated with Automation

WORKING ENVIRONMENT
Maintenance & Improvement Facility

We provide maintenance and improvement with analytical data report “before” and “after”.
Customer can understand their equipment condition and make decision for next action.
Example cleaning ducting, after we clean it up we take data for air flow before and after, check the blower condition and give customer preventive action suggestion.
error: Cannot select at the moment.